Pneumatic Grout/Water/Gas Injection Hole Packer For Soil Investigation
Product Description
Structure: The hole packer is composed of a water injection nozzle, a check valve and an expansion rubber pipe.
Application: The hole packer may be used to inject water into the coal seam to loosen the coal seam and to improve the coal exploration and coal seam organization. When water is injected into the coal, it can wet and break the coal body,
so that some gas will be released. It can reduce the concentration of coal gas and dust by 80% or better. In this way, it can improve the operating environment and helps to reduce the hazards of fire and ensure the safety underground.
Model |
length (mm) |
OD (mm) |
applicable aperture(mm) |
free-expansion OD(mm) |
working pressure(Mpa) |
Burst pressure(Mpa) |
proof pressure(Mpa) |
L-55/5 |
L±5 |
55±1 |
60-70 |
90-105 |
5 |
20 |
10 |
L-63/4 |
L±5 |
63±1 |
70-80 |
95-110 |
4 |
20 |
10 |
L-70/4 |
L±5 |
70±1.5 |
75-90 |
105-120 |
4 |
16 |
8 |
L-83/4 |
L±5 |
83±1.5 |
89-110 |
115-130 |
4 |
16 |
8 |
Company Profile
Shandong yacheng petroleum technology are established in 2003 year, located in Dongying city, shengli oilfield,which is second largest oilfield of China.
Our business scope includes oilfield equipment supply, such as, drilling equipment and spares, wellhead equipment ,oil recovery equipment.
We have been served Shengli oilfield in the last 19 years, established a solid partnership and network with quality OEM factories.
Based on our responsive and responsible engineering & commercial team, we can provide one-stop shop service to our customer, and package plan of procurement which brings added value in terms of delivery time, fair prices, inventory in stock.
We are Looking forward to build up partnership with your company and provide our attentive service to you.
Foreign oil delegation visits
Certifications
Packaging & Shipping
FAQ
1) About Packing Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
2) Terms of payment: We accept T/T,L/C
3)Terms of Shipment: About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment: Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee: One year since delivery.
6)Inspection: 100% testing before delivery.