Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | Support |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Casing Roller repairs and restores dented,collapsed, or buckled tubing or casing of anysize and weight to its original inside diameter
and roundness.
The Casing Roller is composed ofa mandrel with eccentric roll surfaces, three heavy-duty, precision ground rollers, a nose
cone, and rugged ball bearings. Special wear resistant alloy steels are used in the manufacture of the tool. The rollers are hardened to improve their wear resistance. The rollers are secured to the mandrel by the nose cone that is retained by rugged ball bearings. Circulation capabilities are provided by a through bore.
Casing Rollers can be redressed with larger size rollers to restore larger size casing. The casing roller can be used in right-hand or lefthand rotation and can be ordered with either right- or left-hand connections. Special nose cones can be ordered with a tool joint connection so that lower stinger assemblies can be run if desired.
We shandong yacheng petroleum technology are established in 2003 year, located in Dongying city, shengli oilfield,which is second largest oilfield of China.
Our business scope includes oilfield equipment supply, such as, drilling equipment and spares, wellhead equipment ,oil recovery equipment.
We have been served Shengli oilfield in the last 19 years, established a solid partnership and network with quality OEM factories.
Based on our responsive and responsible engineering & commercial team, we can provide one-stop shop service to our customer, and package plan of procurement which brings added value in terms of delivery time, fair prices, inventory in stock.
We are Looking forward to build up partnership with your company and provide our attentive service to you.
1) About Packing Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
2) Terms of payment: We accept T/T,L/C
3)Terms of Shipment: About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment: Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee: One year since delivery.
6)Inspection: 100% testing before delivery.