Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | Support |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Downhole motor is a kind of downhole dynamic drilling tool upon the power of drilling mud. Mud stream from the outlet of mud pump flows through into the motor. This stream produces pressure loss at both inlet and outlet of the pump, to push the rotor into rotating, and to transmit the torque and speed onto the bit. The downhole motor property mainly depends upon its property parameters.
Type |
5LZ73 7.0 |
5LZ89 7.0 |
5LZ95 7.0 |
7LZ95 3.5 |
9LZ95 7.0 |
5LZ120 7.0 |
|
Hole Size |
Mm |
95~121 |
114~152 |
118~152 |
118~152 |
118~152 |
149~200 |
In |
33/4~43/4 |
41/2~6 |
45/8~6 |
45/8~6 |
45/8~6 |
57/8~77/8 |
|
Thread Type |
Top |
23/8"REG |
23/8"REG |
27/8"REG |
27/8"TBG |
27/8"REG |
31/2"REG |
Bottom |
23/8"REG |
23/8"REG |
27/8"REG |
27/8"REG |
27/8"REG |
31/2"REG |
|
Nozzle pressure drop |
Mpa |
1.4~7 |
1.4~7 |
1.4~7 |
1.4~3.5 |
1.4~7 |
1.4~7 |
Recommend Flow |
L/S |
3~8 |
3~8 |
7~12 |
7~11 |
6~10 |
9~14 |
Bit rotary |
R/Min |
109~291 |
95~200 |
90~195 |
120~240 |
90~200 |
95~200 |
Motor pressure drop |
Mpa |
2.4 |
2.4 |
3.2 |
2.4 |
2.4 |
3.2 |
Working torque |
N.M |
460 |
628~838 |
1260~1630 |
723~960 |
750~1020 |
1480~1820 |
Lagging torque |
N.M |
650 |
1300 |
2200 |
1500 |
1550 |
2440 |
Output power |
KW |
4.7~12.5 |
7.3~15.3 |
13.6~29.5 |
18~24 |
8.3~18.5 |
16.4~34.5 |
Recommended bit weight |
T |
4.7~12.5 |
2.0 |
2.5 |
1.0 |
2.5 |
3 |
Max bit weight |
T |
2.5 |
3.0 |
5 |
1.5 |
5 |
5 |
Length |
Straight |
3450 |
3570 |
4450 |
2500 |
3590 |
5085 |
Single curve |
3450 |
|
4675 |
|
3590 |
5335 |
|
Weight |
Straight |
100 |
98 |
140 |
89 |
120 |
390 |
Single curve |
102 |
|
150 |
|
120 |
420 |
We shandong yacheng petroleum technology are established in 2003 year, located in Dongying city, shengli oilfield,which is second largest oilfield of China.
1) About Packing
Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
2) Terms of payment:
We accept T/T,L/C
3)Terms of Shipment:
About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment:
Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee:
One year since delivery.
6)Inspection:
100% testing before delivery.