Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | Support |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Reamer shoe system enables operators to guide casing or liners to total depth. It uses an eccentric guide nose to negotiate ledges and other wellbore obstructions while its integrated cutting structures simultaneously ream out tight spots. Highly versatile, the S10 reamer shoe is compatible with casing and liners of all sizes, including those with large diameters, and with the full spectrum of casing- and liner-hanger assemblies.
Size (in)
|
Bore O.D (in)
|
Bore I.D (in)
|
Min.Bore Parameter (in)
|
Thread Type
|
Ib (in 2)
|
5 1/ 2"
|
6"
|
4 3/ 4"
|
2"
|
5 1/ 2" LCSG
|
4351
|
7"
|
7 5/ 8"
|
6 1/ 4"
|
2 3/ 8"
|
7" LCSG
|
3626
|
9 5/ 8"
|
10 5/ 8"
|
8 5/ 8"
|
2 3/ 8"
|
9 5/ 8" LCSG
|
3626
|
13 3/ 8"
|
14 3/ 8"
|
12 3/ 8"
|
2 3/ 8"
|
13 3/ 8" LCSG
|
3626
|
Application:
1.Guiding casing or liners to TD by reaming out tight spots, climbing ledges, and negotiating wellbore obstructions through rotation or reciprocation of the pipe
2.Guiding large-diameter casing or liners to TD when little or no rotation is possible
We shandong yacheng petroleum technology are established in 2003 year, located in Dongying city, shengli oilfield,which is second largest oilfield of China.
Our business scope includes oilfield equipment supply, such as, drilling equipment and spares, wellhead equipment ,oil recovery equipment.
We have been served Shengli oilfield in the last 19 years, established a solid partnership and network with quality OEM factories.
Based on our responsive and responsible engineering & commercial team, we can provide one-stop shop service to our customer, and package plan of procurement which brings added value in terms of delivery time, fair prices, inventory in stock.
We are Looking forward to build up partnership with your company and provide our attentive service to you.
1) About Packing Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
2) Terms of payment: We accept T/T,L/C
3)Terms of Shipment: About 30 days after receiving the advance payment,or according to both parties agreement
4)Ports of shipment: Tianjin,Qingdao, shanghai or other required Port, by sea or air
5)Guarantee: One year since delivery.
6)Inspection: 100% testing before delivery.